Jayess & Co.

Faridabad works · Delhi licence

Engineered in-house.
Built for industry.

Jayess & Co. winds, assembles and tests distribution transformers, control transformers, servo voltage stabilisers and control panels at Faridabad. ISO 9001:2015 certified.

SHOT NEEDED

What is documented

Every claim on this site traces to a document you can open. Where we hold no document, the page says so rather than filling the gap.

  • ISO 9001:2015 quality management certificateE20250830652Royal Assessments Pvt. Ltd., accredited through EGACOpen document
  • Electrical contractor licence — Government of NCT of Delhi50590000009690Labour Department, Government of NCT of DelhiOpen document
  • Power control centres built to IS/IEC 61439-2IS/IEC 61439-2Referenced standard
  • Electrical testing station at the works, including a 5 kV high-voltage breakdown testerHVTD-5Evidences that the equipment exists and is in use. No calibration certificate, test report or type test is held, and none is implied.
  • Certificate of compliance ICM-CE-25032228, issued by ICMBV LimitedICM-CE-25032228ICMBV Limited, 71-75 Shelton Street, London WC2H 9JQA third-party certificate of compliance, dated 14 August 2025 and valid to 13 August 2028 — not an EU Declaration of Conformity, and it names no Notified Body number. The four directives it cites (73/23/EEC, 92/59/EEC, 98/37/EEC and 93/42/EEC, the medical devices directive) have all been repealed, and a fifth, 59/336/EEC, does not exist. The certificate itself states that it rests on a single sample, does not imply assessment of whole production, and that the CE mark may be applied only under the manufacturer's own declaration of conformity. It is offered as a document on file, and no claim of current EU conformity is made from it anywhere on this site.Open document

Products

All products, including what is not published yet

Built around the requirement

Engineering support before procurement, manufacture and installation — not only after a specification exists.

Have a rating, drawing, load schedule, site condition or electrical problem? We review the requirement, define the engineering scope and route it to the right solution.

Electrical system assessmentLoad assessment & load schedulingTransformer selection & sizingLT/HT distribution assessmentPCC/MCC engineering reviewAPFC & power-factor correction assessmentHarmonic / power-quality assessmentVoltage fluctuation & stabilisation assessmentProtection & breaker coordination reviewSLD, GA, schematic & feeder-schedule reviewCable & busbar sizing reviewDG synchronisation requirementsIndustrial electrical troubleshootingSite survey & condition assessmentTechnical specification / tender / GTP reviewEquipment selection & engineering recommendationTesting, commissioning & implementation support

How a requirement becomes plant

01

Requirement

A rating, a drawing, a load schedule, a site condition or a problem. Whatever you have.

02

Engineering review

We read it, ask what is missing, and define the engineering scope before anything is quoted.

03

Approval

General arrangement and schematic issued for your approval before manufacture begins.

04

Build, test, handover

Manufactured and tested at Faridabad, installed and commissioned under the Delhi licence, documentation handed over.

At the works

Winding, fabrication, assembly and works testing, with the plant available at Faridabad.

A grey testing console with four instrument panels, energised indication lamps, digital voltmeters and ammeters, four variac control knobs along the bench, and a high-voltage test lead coiled on the surface.
Electrical testing station at the works. The console carries a 5 kV high-voltage breakdown tester and four variacs labelled for transformer testingHigh Voltage Breakdown Tester 5 kV, model HVTD-5 — read from the nameplate, not a range
SHOT NEEDED
Works gallery

Industries served

An industry appears here only when there is a real installation behind it. We hold a photograph of AMF and DG control panels installed and commissioned on site, and no project record to describe it, so this section stays empty until verified project references exist.

Send the requirement

Send the rating, the single line diagram and the site. That is enough for a firm quotation — an enquiry without them gets a phone call asking for them.