Jayess & Co.

Solar systems, on-grid and off-grid

On-line and off-line solar systems, a certified activity under our ISO 9001:2015 scope.

On/off-line solar system is one of the thirteen activities named in the scope of our ISO 9001:2015 certificate. Scope, capacity and the balance of system are defined against your roof or ground area, load profile and grid arrangement.

  • Named in our ISO 9001:2015 certified scope
SHOT NEEDEDPrimary product photograph for solar systems — three-quarter view at the works, full frame, even light
SPECIFICATION
Specification. 1 of 6 values are documented; the rest are set per order or unpublished.
Capacity To your requirement Set by your available area and load profile.
On-grid or off-grid To your requirement Determined by your grid arrangement and whether the load must ride through an outage.
Scope of supply To your requirement Defined at engineering review — panels, inverter, structure, LT distribution and protection as required.
Certified activity On/off-line solar system Named in the scope of ISO 9001:2015 certificate E20250830652.Source: ISO 9001:2015 certificate E20250830652, scope block
Installed capacity to date Not published — no project record, generation data or photograph has been supplied for this activity.
Panel and inverter makes Not published — no supplier or approval documentation has been supplied.

Evidence

  • ISO 9001:2015 quality management certificateE20250830652Royal Assessments Pvt. Ltd., accredited through EGACOpen document
  • Thirteen activities are named in the scope of ISO 9001:2015 certificate E20250830652: LT control panels; MCC; PCC; PLC panels; VFD panels; power factor panels (APFCR); control transformer; distribution transformers (dry and oil); on-line UPS; compact sub-station; on/off-line solar system; electrical turnkey projects; electrical consultant/contractor and electrical worksE20250830652Royal Assessments Pvt. Ltd., accredited through EGACOpen document

Related

Enquire about solar systems

Send the rating, the single line diagram and the site. That is enough for a firm quotation — an enquiry without them gets a phone call asking for them.