PCC — power control centres
Main distribution boards with structured busbar and cable management.
Bus bracing, clearances and routing are settled at drawing stage and verified at the works before dispatch.
- Fabricated and tested at Faridabad works
- Continuous busbar chamber, full-height cable alley
SHOT NEEDEDPrimary product photograph for pcc panels — three-quarter view at the works, full frame, even light
| Standard | IS/IEC 61439-2 Source: Company Profile 2026; existing site copy |
|---|---|
| Incomer and outgoing ratings | To your requirement Drawn from your feeder schedule. |
| Busbar rating and bracing | To your requirement Settled at drawing stage against your fault level. |
| Enclosure and ingress rating | To your requirement Selected against the installation environment. |
| Construction | Continuous busbar chamber, full-height cable alley Busbar chamber and cable alleys are labelled as separate vertical compartments on the photographed board.Source: Existing site copy, carried from Company Profile 2026; corroborated by compartment labels legible in works photograph |
| Form of separation | Not published — no Form designation has been supplied for publication. Confirmed against your drawing at enquiry. |
| Short-circuit withstand | Not published — no type-test evidence is on file. |
Evidence
- Thirteen activities are named in the scope of ISO 9001:2015 certificate E20250830652: LT control panels; MCC; PCC; PLC panels; VFD panels; power factor panels (APFCR); control transformer; distribution transformers (dry and oil); on-line UPS; compact sub-station; on/off-line solar system; electrical turnkey projects; electrical consultant/contractor and electrical worksE20250830652Royal Assessments Pvt. Ltd., accredited through EGACOpen document
- ISO 9001:2015 quality management certificateE20250830652Royal Assessments Pvt. Ltd., accredited through EGACOpen document
- Power control centres built to IS/IEC 61439-2IS/IEC 61439-2Referenced standard
At the works
SHOT NEEDED
SHOT NEEDED
SHOT NEEDED
SHOT NEEDED
SHOT NEEDED
SHOT NEEDED
SHOT NEEDED
SHOT NEEDED
Documents
- Panel general arrangement drawing Drawn to your feeder schedule and site constraint, issued for approval before manufacture.Request Drawn to your feeder schedule and site constraint.
- As-built panel schematic As-built schematic, ferruled to match the panel, handed over with the equipment.Request Issued for the assembly you are specifying, against the enquiry.
- Operation and maintenance manual Issued with the plant, covering routine maintenance intervals and torque values.Request Issued with the plant it documents.
Related
Enquire about pcc panels
Send the rating, the single line diagram and the site. That is enough for a firm quotation — an enquiry without them gets a phone call asking for them.