Jayess & Co.

Control, PLC and VFD panels

Custom control panels wired and tested against the project documentation.

Assemblies are built to the customer single line diagram, schematic and I/O schedule, with works testing before handover.

  • Built to project drawings
  • Ferruled wiring and drawing traceability
  • Functional I/O checks before dispatch
SHOT NEEDEDPrimary product photograph for control panels — three-quarter view at the works, full frame, even light
SPECIFICATION
Specification. 1 of 5 values are documented; the rest are set per order or unpublished.
Your single line diagram and schematic To your requirement The panel is built to the documentation you supply.
Incomer and feeder ratings To your requirement Drawn from your schedule.
Processor and drive family To your requirement Built around the processor and drive family your plant already stocks.
Works testing Point-to-point I/O against the schedule Source: Existing site copy, carried from Company Profile 2026
Form of separation Not published — no Form designation has been supplied for publication.

Evidence

  • Thirteen activities are named in the scope of ISO 9001:2015 certificate E20250830652: LT control panels; MCC; PCC; PLC panels; VFD panels; power factor panels (APFCR); control transformer; distribution transformers (dry and oil); on-line UPS; compact sub-station; on/off-line solar system; electrical turnkey projects; electrical consultant/contractor and electrical worksE20250830652Royal Assessments Pvt. Ltd., accredited through EGACOpen document
  • ISO 9001:2015 quality management certificateE20250830652Royal Assessments Pvt. Ltd., accredited through EGACOpen document

At the works

SHOT NEEDED
SHOT NEEDED

Documents

  • As-built panel schematic As-built schematic, ferruled to match the panel, handed over with the equipment.
    Request Issued for the assembly you are specifying, against the enquiry.
  • Operation and maintenance manual Issued with the plant, covering routine maintenance intervals and torque values.
    Request Issued with the plant it documents.

Related

Enquire about control panels

Send the rating, the single line diagram and the site. That is enough for a firm quotation — an enquiry without them gets a phone call asking for them.