Vendors and suppliers
Supplying material, components or services into the Jayess works at Faridabad.
Who this is for
- Component and raw-material suppliers
- Sheet-metal fabrication and powder coating
- Switchgear, busbar and cable suppliers
- Transport and logistics
- Calibration and testing services
Jayess buys components, raw material and services into a works that winds transformers, fabricates and assembles panels, and tests before dispatch. Supply that touches the finished product has to survive the same evidence discipline everything else here does: what goes into an assembly must be traceable to a document.
Send what you supply and the evidence behind it. A first reply that can be useful needs the specification and the test or compliance documentation, not a brochure.
What is established
- ISO 9001:2015 certified, certificate E20250830652. Incoming material is expected to be documented to a standard consistent with that system.
- Manufacturing at Plot No. 366, Sector 24, Industrial Area NIT, Faridabad 121005, Haryana.
- Works testing is carried out in-house before dispatch, so component test documentation is used rather than filed.
What is not published, and why
These are the things you will look for and not find here. They are absent because they have not been set or documented — not because they are being withheld until you enquire.
- A vendor registration portal or supplier code
- None exists. Registration today is an e-mail conversation, and pretending otherwise would send people looking for a login that is not there.
- Payment terms and commercial conditions
- Agreed per supplier and per order, in writing. No standing terms have been published.
- Approved vendor list
- Internal, and not published. Inclusion is not implied by making an enquiry.
What to send
Send these and the first reply can be useful. Send none of them and the first reply is a list of questions, which wastes a week.
- What you supply, specifically
- A component, a material grade, a process or a service — each is assessed differently.
- Applicable standards and test documentation
- What goes into a certified assembly has to be traceable to a document.
- Your certifications, if any
- ISO or product certification shortens assessment considerably.
- Location and lead time
- Faridabad is the delivery point; lead time affects whether it fits a build schedule.
- Capacity and typical batch size
- Tells us whether the supply matches how we actually order.
Register interest as a supplier
Or reach us directly
Prefer to speak first
A short call is often faster than a form for a partnership question.